10Pcs Axial Polyester Film Capacitor Mylar Assortment Kit with Long Lead 0.022uF 630V for Radio Amplifier

Prices from
8.12

Sponsored links

Description

Amazon User-Friendly Design: Lightweight and compact with a simple structure for effortless installation and handling. Stable and Reliable Performance: Polyester film capacitors deliver consistent operation with long-term durability. Versatile Applications: Ideal for vintage radios, tube amplifiers, and other classic electronics. Precision Specifications: Rated at 630V with 0.022uF capacitance; compact dimensions (5.7mm diameter × 15.3mm length). Perfect for All Skill Levels: A top choice for both professional engineers and DIY enthusiasts.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 8.12

Description (1)

User-Friendly Design: Lightweight and compact with a simple structure for effortless installation and handling. Stable and Reliable Performance: Polyester film capacitors deliver consistent operation with long-term durability. Versatile Applications: Ideal for vintage radios, tube amplifiers, and other classic electronics. Precision Specifications: Rated at 630V with 0.022uF capacitance; compact dimensions (5.7mm diameter × 15.3mm length). Perfect for All Skill Levels: A top choice for both professional engineers and DIY enthusiasts.


Product specifications

Brand Garosa
EAN
  • 0717207885407

Featured Choice
£ 8.12
To Shop