3 Way + USB Cube Extension Socket 13a 1.4m Long Lead Cable With Plug Black

Prices from
16.99

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon 3 x 13A Sockets. 1.4 Meter Lead with UK Plug. 3 USB Ports 2.4 Amp Max Output. Compatible with iOS, Android and Windows Smartphones and Tablets. On/Off Switch.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 16.99

Description (1)

3 x 13A Sockets. 1.4 Meter Lead with UK Plug. 3 USB Ports 2.4 Amp Max Output. Compatible with iOS, Android and Windows Smartphones and Tablets. On/Off Switch.


Product specifications

Brand Mr. Gadget Solution&reg
EAN
  • 5055538785498

Featured Choice
£ 16.99
To Shop