AIME Black Leather Dog Lead, Long Lead 1.2 m, Soft and Durable

Prices from
15.42

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon Long black leather lead: 100% cow, flexible and durable Strong and durable, fine workmanship 1m20 lead, ideal for walking or running Suitable for all types of dogs

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 15.42

Description (1)

Long black leather lead: 100% cow, flexible and durable Strong and durable, fine workmanship 1m20 lead, ideal for walking or running Suitable for all types of dogs


Product specifications

Brand Aime
EAN
  • 3281018190311
Color
  • Black

Featured Choice
£ 15.42
To Shop