Aioneus iPhone Charger Cable, Lightning Cable 2M Charging MFi Certified Long Lead USB for 14 13 12 11 Pro Max XS XR X 8 7 6 Plus 5 SE

Prices from
6.99

Featured


Description

Amazon Marketplace Fast Charging and Sync iPhone Charger】: the newly upgraded original connector. Aioneus iPhone Charger Cable output power up to 5V 3A, which is ensured by high-speed safe charging, and supports data transfer speed can reach 40~60MB/S (480Mbps).This is faster than most standard cable. 【Perfect Compatible iPhone Charger Cable】 : Aioneus iPhone Charger for iphone 14 /14 Pro/ 14 Pro Max/13 /13 Pro/ 13 Pro Max/ 13 Mini/12 /12 Pro/ 12 Pro Max/ 12 Mini/ 11/ 11 Pro/11 Pro Pax/XR / XS / XS Max / X /10/ 8 / 8 Plus /7 / 7 Plus/6s Plus / 6s / 6 Plus / 6/5s / 5c / 5 / SE/ SE 2020, iPad Pro 10.5-inch / iPad Pro 12.9-inch / Pro 9.7-inch/Pro 2020/Pro 11/Air / Air 2/mini/mini 2 /mini 3 /mini 4/mini 5/ ipad 7th/ 6th /8th gen 【iPhone MFi Certified Lightning Cable】: Our Lightning Cable has passed MFi certification to ensure 100% compatibility with iPhone, iPad, iPod.Built with iphone's original terminal and smart chip. Original 8 Pin connector with a lightning end, ensured safe charging for your iphone devices. Enjoy fast data transfer, syncing and charging. 【2m iPhone Charger Cable】: With the 2m length, you can lie on the sofa and use your devices while you are charging at the same time. Allow you to be use freely in bedroom, office and even in the backseat of your car 【Nylon Braided iPhone Cable】: Aioneus iPhone charger cable features an ultra-durable construction, Tangle-free Nylon Braided Design, make the iPhone Charging Cable more sturdier than others. Each cable has been tested with 30000+ times bend lifespan and strong bearing capacity. The durability is three times as long as that of ordinary charging cables 【What You Get】: We Provide Nylon Braided 1pack 2m iphone lightning cable (pink) with 18 Months Worry-Free Replacement and 24/7 customer service, if you have any questions, we will resolve your issue within 24

Compare webshops (1)

Shop
Price
£ 6.99
Description (1)

Fast Charging and Sync iPhone Charger】: the newly upgraded original connector. Aioneus iPhone Charger Cable output power up to 5V 3A, which is ensured by high-speed safe charging, and supports data transfer speed can reach 40~60MB/S (480Mbps).This is faster than most standard cable. 【Perfect Compatible iPhone Charger Cable】 : Aioneus iPhone Charger for iphone 14 /14 Pro/ 14 Pro Max/13 /13 Pro/ 13 Pro Max/ 13 Mini/12 /12 Pro/ 12 Pro Max/ 12 Mini/ 11/ 11 Pro/11 Pro Pax/XR / XS / XS Max / X /10/ 8 / 8 Plus /7 / 7 Plus/6s Plus / 6s / 6 Plus / 6/5s / 5c / 5 / SE/ SE 2020, iPad Pro 10.5-inch / iPad Pro 12.9-inch / Pro 9.7-inch/Pro 2020/Pro 11/Air / Air 2/mini/mini 2 /mini 3 /mini 4/mini 5/ ipad 7th/ 6th /8th gen 【iPhone MFi Certified Lightning Cable】: Our Lightning Cable has passed MFi certification to ensure 100% compatibility with iPhone, iPad, iPod.Built with iphone's original terminal and smart chip. Original 8 Pin connector with a lightning end, ensured safe charging for your iphone devices. Enjoy fast data transfer, syncing and charging. 【2m iPhone Charger Cable】: With the 2m length, you can lie on the sofa and use your devices while you are charging at the same time. Allow you to be use freely in bedroom, office and even in the backseat of your car 【Nylon Braided iPhone Cable】: Aioneus iPhone charger cable features an ultra-durable construction, Tangle-free Nylon Braided Design, make the iPhone Charging Cable more sturdier than others. Each cable has been tested with 30000+ times bend lifespan and strong bearing capacity. The durability is three times as long as that of ordinary charging cables 【What You Get】: We Provide Nylon Braided 1pack 2m iphone lightning cable (pink) with 18 Months Worry-Free Replacement and 24/7 customer service, if you have any questions, we will resolve your issue within 24


Product specifications

Brand Aioneus
EAN
  • 6936878819724
Color
  • Pink
MPN
  • Aioneusuk2311081753

Price History

Prices were last updated on:

Featured Choice
£ 6.99
To Shop