BOGCLEE Compass Replacement Leads, 2B Refills, 100pcs 2 mm Diameter Compasses Refills cm Long Leads for Mathematical Drawing Creation

Prices from
4.99

Sponsored links

Description

Amazon High-quality Compass Leads: the compass replacement leads are made of high-quality graphite, the writing is smooth, stable and not easy to break, safe and non-toxic. Versatile: each compass replacement leads have a length of 2 cm and a diameter of 2 mm, model 2B. Can be used for most interchangeable compasses and pencils as well as for general writing applications such as notes, writing letters, woodworking, painting, sketching, etc. Easy to Carry: The compass refill is packed in a small transparent plastic box, which is small and easy to close, so it can be stored and used more conveniently, and not easy to lost. Wide Application: 2B compass replacement leads can be used in most compasses and pens, suitable for notes, letter drawings, woodworking markings etc., such as at home, school, etc. Comprehensive Package: Our compass lead set comes with a whopping 100 compass refills, housed in 10 clear boxes, providing plenty for everyday use.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 4.99

Description (1)

High-quality Compass Leads: the compass replacement leads are made of high-quality graphite, the writing is smooth, stable and not easy to break, safe and non-toxic. Versatile: each compass replacement leads have a length of 2 cm and a diameter of 2 mm, model 2B. Can be used for most interchangeable compasses and pencils as well as for general writing applications such as notes, writing letters, woodworking, painting, sketching, etc. Easy to Carry: The compass refill is packed in a small transparent plastic box, which is small and easy to close, so it can be stored and used more conveniently, and not easy to lost. Wide Application: 2B compass replacement leads can be used in most compasses and pens, suitable for notes, letter drawings, woodworking markings etc., such as at home, school, etc. Comprehensive Package: Our compass lead set comes with a whopping 100 compass refills, housed in 10 clear boxes, providing plenty for everyday use.


Product specifications

Brand BOGCLEE
EAN
  • 0780887115294
Color
  • Black

Featured Choice
£ 4.99
To Shop