Claims and Extensions of Time: A Practical Guide to Building Reviewing Extension Time Prolongation Cost under FIDIC, AIA NEC Contracts

Prices from
141.36

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Claims and Extensions of Time: A Practical Guide to Building Reviewing Extension Time Prolongation Cost under FIDIC, AIA NEC Contracts

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 141.36

Description (0)

Claims and Extensions of Time: A Practical Guide to Building Reviewing Extension Time Prolongation Cost under FIDIC, AIA NEC Contracts


Product specifications

Brand Independently Published
EAN
  • 9798141424786

Featured Choice
£ 141.36
To Shop