Compare webshops (1)
Sponsored links · Some shops pay us a fee
Shops with other sizes
The dog walking belt with lead has been made of polypropylene, providing comfort and functionality during walks while allowing hands-free use. It works excellently as an alternative to a traditional leash The leash is 6 meters long, providing adequate freedom of movement for the dog. The leash width is approximately 1.6 cm, making it suitably durable and resistant to abrasion The shock absorber provides shock reduction. The chrome-plated carabiner allows you to leash the dog quickly. The second large carabiner is used to attach the excess rolled-up leash, which can be adjusted as needed We fasten the walking leash below the waist with a plastic buckle, and the stepless adjustment allows the product to be tailored to any silhouette. The lightweight belt with a leash can be used for both daily walks and training Machine washable at 30 degrees Celsius. Dog walking belts, hands-free leashes, training leads, and other pet equipment are handcrafted in Poland by Dingo - the original brand since 1977