Dog Tie Out Stake and Run Cable, 9MLong Lead with Yard Stake, Chains for Outside, Leash Camping & Beach, Tether Medium Large Dogs

Prices from
12.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon ๐‡๐ž๐š๐ฏ๐ฒ ๐ƒ๐ฎ๐ญ๐ฒ ๐“๐ข๐ž ๐Ž๐ฎ๐ญ ๐’๐ญ๐š๐ค๐ž: Our dog tie out cable and stake set is designed with more solid and durable, thickened stainless steel spiral stake and reinforced O-ring make this dog anchor no more easier broken and bending. Ergonomic handle of the dog ground stake gives more comfort while saving time and effort when insert and pull out ๐Ÿ—๐ฆ ๐“๐ข๐ž ๐Ž๐”๐ญ ๐‚๐š๐›๐ฅ๐ž ๐š๐ง๐ ๐’๐ญ๐š๐ค๐ž: Our 9m dog tie out leads for yard with 5.0mm diameter stainless steel vinyl-coated rope which is strength tested for dogs up to 150lbs. All the run cables have rigorously quality tested to withstand up to 5000+N pull force. Providing more space for free movement while ensuring safety ๐‡๐ข๐ ๐ก ๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐๐ฎ๐œ๐ค๐ฅ๐ž: Heavy duty 360ยฐ swivel clip is designed with high grade steel which is rust-proof and wear-resistant, ultra-light but super strong for small to large dogs. Both ends of the dog chain leads have no tangle clips, which can reduce the tangle when dog is moving, aim to prevent dogs from being entangled ๐„๐š๐ฌ๐ฒ ๐ญ๐จ ๐”๐ฌ๐ž: With the ergonomic handle and spiral stake design, you can screw the dog yard stake into the ground very easy, and then connect with the tie out cable, the quick release clips can ensure easy on & off connection, saving time and effort ๐€ ๐‚๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž ๐’๐ž๐ญ & ๐„๐š๐ฌ๐ฒ ๐ญ๐จ ๐‚๐š๐ซ๐ซ๐ฒ: Package include: 1 X 9m dog runner tie out cable, 1 X dog tie out stake, 1 X oxford storage bag for easy carrying out when camping outside. Our dog stake and tie out cable set is heavy duty enough for small to large dogs up to 150lbs dogs

Compare webshops (2)

Sponsored links ยท Some shops pay us a fee

Sort by:

ยฃย 12.99

ยฃย 20.08

Description (1)

๐‡๐ž๐š๐ฏ๐ฒ ๐ƒ๐ฎ๐ญ๐ฒ ๐“๐ข๐ž ๐Ž๐ฎ๐ญ ๐’๐ญ๐š๐ค๐ž: Our dog tie out cable and stake set is designed with more solid and durable, thickened stainless steel spiral stake and reinforced O-ring make this dog anchor no more easier broken and bending. Ergonomic handle of the dog ground stake gives more comfort while saving time and effort when insert and pull out ๐Ÿ—๐ฆ ๐“๐ข๐ž ๐Ž๐”๐ญ ๐‚๐š๐›๐ฅ๐ž ๐š๐ง๐ ๐’๐ญ๐š๐ค๐ž: Our 9m dog tie out leads for yard with 5.0mm diameter stainless steel vinyl-coated rope which is strength tested for dogs up to 150lbs. All the run cables have rigorously quality tested to withstand up to 5000+N pull force. Providing more space for free movement while ensuring safety ๐‡๐ข๐ ๐ก ๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐๐ฎ๐œ๐ค๐ฅ๐ž: Heavy duty 360ยฐ swivel clip is designed with high grade steel which is rust-proof and wear-resistant, ultra-light but super strong for small to large dogs. Both ends of the dog chain leads have no tangle clips, which can reduce the tangle when dog is moving, aim to prevent dogs from being entangled ๐„๐š๐ฌ๐ฒ ๐ญ๐จ ๐”๐ฌ๐ž: With the ergonomic handle and spiral stake design, you can screw the dog yard stake into the ground very easy, and then connect with the tie out cable, the quick release clips can ensure easy on & off connection, saving time and effort ๐€ ๐‚๐จ๐ฆ๐ฉ๐ฅ๐ž๐ญ๐ž ๐’๐ž๐ญ & ๐„๐š๐ฌ๐ฒ ๐ญ๐จ ๐‚๐š๐ซ๐ซ๐ฒ: Package include: 1 X 9m dog runner tie out cable, 1 X dog tie out stake, 1 X oxford storage bag for easy carrying out when camping outside. Our dog stake and tie out cable set is heavy duty enough for small to large dogs up to 150lbs dogs


Product specifications

Brand Snagle Paw
EAN
  • 8424615321329
Material
  • Stainless steel
Color
  • Red
Size


Price History

* Price history contains no data from Amazon.

Prices were last updated on:

Featured Choice
ยฃย 12.99
To Shop