EZYDOG Zero Shock LITE Dog Lead Technology, Leads For Small Dogs, Absorbing, 1.2m, Leads, Long Lead, Padded Handle, Up To 12kg Dog, Puppy 48 inches (Pink)

Prices from
21.00

Featured

COMPARE ALL WEBSHOPS (1)

Description

Amazon ENHANCED SHOCK FEATURE – Experience advanced shock absorption with the innovative Zero Shock Technology bungee component that is embedded in the centre of the no pull dog lead. This feature effectively cushions sudden jolts and reduces tension, ensuring a comfortable walk for both you and your dog DESIGNED FOR COMFORT – Crafted from super soft, double-density nylon, this double handle dog lead is durable and comfortable. It includes an accessory D-ring and a grab handle that provides enhanced control during walks, while the soft neoprene lining in the handle adds an extra layer of comfort PRACTICAL & SAFETY FEATURES – Made from narrow 15mm webbing, this EzyDog zero shock dog lead is lighter in weight than the standard version, making it ideal for dogs under 12kg. The lead’s reflective trim enhances visibility in low light, ensuring added safety during evening walks FIND THE PERFECT FIT – The EzyDog Zero bungee dog lead is available in a range of colours to suit your furry friend, in the standard 1.2m (48”) size made for smaller dogs NOW GO AND PLAY – Made from proprietary soft touch webbing, the Ezydog collars and leads are rigorously tested for durability, safety and comfort. Our aim is to allow both you and your dog to focus on what matters: making everlasting memories in the great outdoors

Compare webshops (1)

Shop
Price
£ 21.00
Description (1)

ENHANCED SHOCK FEATURE – Experience advanced shock absorption with the innovative Zero Shock Technology bungee component that is embedded in the centre of the no pull dog lead. This feature effectively cushions sudden jolts and reduces tension, ensuring a comfortable walk for both you and your dog DESIGNED FOR COMFORT – Crafted from super soft, double-density nylon, this double handle dog lead is durable and comfortable. It includes an accessory D-ring and a grab handle that provides enhanced control during walks, while the soft neoprene lining in the handle adds an extra layer of comfort PRACTICAL & SAFETY FEATURES – Made from narrow 15mm webbing, this EzyDog zero shock dog lead is lighter in weight than the standard version, making it ideal for dogs under 12kg. The lead’s reflective trim enhances visibility in low light, ensuring added safety during evening walks FIND THE PERFECT FIT – The EzyDog Zero bungee dog lead is available in a range of colours to suit your furry friend, in the standard 1.2m (48”) size made for smaller dogs NOW GO AND PLAY – Made from proprietary soft touch webbing, the Ezydog collars and leads are rigorously tested for durability, safety and comfort. Our aim is to allow both you and your dog to focus on what matters: making everlasting memories in the great outdoors


Product specifications

Brand Ezydog
EAN
  • 9346036006212
Color
  • Pink

Price History

Prices were last updated on:

Featured Choice
£ 21.00
To Shop