for iPhone Charger Cable, Charging USB Cable Nylon Braided Long Lead Fast Compatible with 11 12 13 14 Pro Max Mini XS XR X 10 8 7 Plus 6s 6 SE, (3 Meter)

Prices from
4.09

Sponsored links

Description

Amazon Fast Charge & Sync Cable: This Braided charging cable supports fast charging (up to 2.4A) while preventing overheating and overcharging, ensure that you and your devices are safe, sync and charge at the same time at the fastest speeds on your PC. Tangle Free Cable: These Reinforced Phone charger cable have passed 10000+ times bending tests for extra protection and durability. The solid and durable braided armor nylon shield gives the Phone cable protection and flexible performance than other cable and no need to worry about tangling, effectively prolong the service life. Safe and Stable Charging: This Fast Charging Cable made by the integrated overheat protection chip and the prevent overcurrent 56KΩ resistor. It intelligently matches the required current and reduces heat.and adopts new reinforced joint technology for extra protection and durability, which extend the life far longer than the other USB cable. Longer Life: The materials of aluminum shell, nylon braided and 250d fiber core, prevent this fast charging cable from fraying and splitting. This charging lead has passed withstanding more than 10,000 pcs 90 degree bends test. The strong 22/28AWG tinned copper core has multiple layers of shielding, to provide a smooth fast charging current without disturbance. Certified Charger Cable: This charging cable is certified and upgraded 8 Pin connector with a fast charging end ensured safe charging for your devices. Enjoy fast charge and data transfer with our nylon braided Phone charger cable. No More Pop up Messages: Not only is our charging cable made with high-quality materials, ensuring a fast and efficient charge, but it also comes with a no pop message guarantee. No more annoying interruptions while trying to power up your phone. Versatility: With the its different length, you can lie on the couch or sofa and use your devices while you are charging at the same time. And you can use freely in your bedroom, office and even in the backseat of your car.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 4.09

Description (1)

Fast Charge & Sync Cable: This Braided charging cable supports fast charging (up to 2.4A) while preventing overheating and overcharging, ensure that you and your devices are safe, sync and charge at the same time at the fastest speeds on your PC. Tangle Free Cable: These Reinforced Phone charger cable have passed 10000+ times bending tests for extra protection and durability. The solid and durable braided armor nylon shield gives the Phone cable protection and flexible performance than other cable and no need to worry about tangling, effectively prolong the service life. Safe and Stable Charging: This Fast Charging Cable made by the integrated overheat protection chip and the prevent overcurrent 56KΩ resistor. It intelligently matches the required current and reduces heat.and adopts new reinforced joint technology for extra protection and durability, which extend the life far longer than the other USB cable. Longer Life: The materials of aluminum shell, nylon braided and 250d fiber core, prevent this fast charging cable from fraying and splitting. This charging lead has passed withstanding more than 10,000 pcs 90 degree bends test. The strong 22/28AWG tinned copper core has multiple layers of shielding, to provide a smooth fast charging current without disturbance. Certified Charger Cable: This charging cable is certified and upgraded 8 Pin connector with a fast charging end ensured safe charging for your devices. Enjoy fast charge and data transfer with our nylon braided Phone charger cable. No More Pop up Messages: Not only is our charging cable made with high-quality materials, ensuring a fast and efficient charge, but it also comes with a no pop message guarantee. No more annoying interruptions while trying to power up your phone. Versatility: With the its different length, you can lie on the couch or sofa and use your devices while you are charging at the same time. And you can use freely in your bedroom, office and even in the backseat of your car.


Product specifications

Brand Brand-Tech
EAN
  • 5061012640863
Color
  • Black

Featured Choice
£ 4.09
To Shop