HEM & BOO DOG PUPPY TRAINING LONG LEAD ORANGE RECALL REFLECTIVE WALKING 15MTR

Prices from
21.61

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon TRAINING RECALL & DISTANCE CONTROL LONG LEAD, IDEAL FOR ALL DOGS & PUPPIES. MADE FROM STRONG MATERIAL FOR DURABLE USE. PADDED & REFLECTIVE FOR HIGH VISIBILITY, EASILY ATTACHED ON TO HARNESSES & COLLARS. HOW TO USE: PLACE YOUR HAND THROUGH THE PADDED HANDLE; WRAP THE LEAD UP LOOSELY, CREATING LARGE LOOPS. ATTACH THE LEAD TO THE BACK OF YOUR DOG’S HARNESS, WITH ONE HAND ON THE LOOPED LEAD USE THE OTHER HAND TO CONTROL THE LENGTH & SLACK OF THE LEAD. SLOWLY UNRAVEL THE LEAD, LOOP BY LOOP, GIVING YOUR DOG MORE FREEDOM & DISTANCE. TO SHORTEN THE DISTANCE PULL THE LEAD GENTLY TOWARDS YOU & RE LOOP. PRACTICE YOUR RECALL TECHNIQUE, SLOWLY INCREASING THE DISTANCE AS YOUR DOG RESPONDS. BUILD UP TO DROPPING THE LONG LEAD COMPLETELY & LETTING IT TRAIL ON THE GROUND. THIS ALLOWS YOUR TO KEEP PRACTICING THEIR RECALL WITH THE OPTION OF HAVING YOUR DOG BACK UNDER CONTROL WITH THE LEAD IF NEEDED. PLEASE NOTE ALL MEASUREMENTS ARE MANUFACTURER STATED. LENGTH - 15M

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 21.61

£ 31.20

Description (1)

TRAINING RECALL & DISTANCE CONTROL LONG LEAD, IDEAL FOR ALL DOGS & PUPPIES. MADE FROM STRONG MATERIAL FOR DURABLE USE. PADDED & REFLECTIVE FOR HIGH VISIBILITY, EASILY ATTACHED ON TO HARNESSES & COLLARS. HOW TO USE: PLACE YOUR HAND THROUGH THE PADDED HANDLE; WRAP THE LEAD UP LOOSELY, CREATING LARGE LOOPS. ATTACH THE LEAD TO THE BACK OF YOUR DOG’S HARNESS, WITH ONE HAND ON THE LOOPED LEAD USE THE OTHER HAND TO CONTROL THE LENGTH & SLACK OF THE LEAD. SLOWLY UNRAVEL THE LEAD, LOOP BY LOOP, GIVING YOUR DOG MORE FREEDOM & DISTANCE. TO SHORTEN THE DISTANCE PULL THE LEAD GENTLY TOWARDS YOU & RE LOOP. PRACTICE YOUR RECALL TECHNIQUE, SLOWLY INCREASING THE DISTANCE AS YOUR DOG RESPONDS. BUILD UP TO DROPPING THE LONG LEAD COMPLETELY & LETTING IT TRAIL ON THE GROUND. THIS ALLOWS YOUR TO KEEP PRACTICING THEIR RECALL WITH THE OPTION OF HAVING YOUR DOG BACK UNDER CONTROL WITH THE LEAD IF NEEDED. PLEASE NOTE ALL MEASUREMENTS ARE MANUFACTURER STATED. LENGTH - 15M


Product specifications

Brand WUNDAPETS
EAN
  • 5055284248087
Color
  • Orange
Size


Price History

* Price history contains no data from Amazon.

Prices were last updated on:

Featured Choice
£ 21.61
To Shop