Sponsored links
Compare webshops (1)
Sponsored links · Some shops pay us a fee
£ 54.14
Shops with other sizes
An everyday lead. Soft thick nylon 3 fold adjusatble.
Hunter
HUNTER Nylon Adjustable Extra Long Lead, 25/300 cm, Brown
HUNTER Nylon Adjustable Extra Long Lead, 20/300 cm, Black
HUNTER Nylon Adjustable Extra Long Lead, 25/300 cm, Black
HUNTER Nylon Adjustable Extra Long Lead, 25/300 cm, Red
Back to top