iPhone Charger Cable, Lightning Cable 6.5ft/2m Braided Long Lead USB Fast Charging Compatible with 11/XR/Pro/Xs Max/X/8/7/Plus/6S/6/SE/5S/12/13 iPad Air

Prices from
3.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon [Wide Compatibility]: Using Apple's lightning connector, this cable is compatible with the following lightning devices: iPhone 13/13 Pro/13 Pro Max/13 Mini/12/12 Pro/12 Pro Max/12 Mini/XS/XS Max/X/XR/8 Plus/8/7 Plus/7/6s Plus/6s/6 Plus/6/5s/5c/5/iPad Pro/Air/Mini/iPod Nano/Touch as well as the latest iOS system Exceptional tensile strength is provided by a high-performance, ultra-strong aramid fiber core, which is wrapped in a double-braided nylon sheath, resulting in a supple yet robust cable with superior toughness The lightning cable 15cm,1Meter, 2 Meter can withstand loads up to 55kg and has been tested to bend 95 degrees more than 9,000 times High-Performance Sync and Transfers simultaneously at the fastest speeds on your devices. Safety Guaranteed with high performance. The compact aluminum connector helps to keep your devices safe Compact heat-resistant Lightning connector fits into most case cutouts, big or small. The advanced technology used in our cables allows them to offer maximum charging speeds, making the product safe and reliable for users.

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 3.99

£ 4.49

Description (1)

[Wide Compatibility]: Using Apple's lightning connector, this cable is compatible with the following lightning devices: iPhone 13/13 Pro/13 Pro Max/13 Mini/12/12 Pro/12 Pro Max/12 Mini/XS/XS Max/X/XR/8 Plus/8/7 Plus/7/6s Plus/6s/6 Plus/6/5s/5c/5/iPad Pro/Air/Mini/iPod Nano/Touch as well as the latest iOS system Exceptional tensile strength is provided by a high-performance, ultra-strong aramid fiber core, which is wrapped in a double-braided nylon sheath, resulting in a supple yet robust cable with superior toughness The lightning cable 15cm,1Meter, 2 Meter can withstand loads up to 55kg and has been tested to bend 95 degrees more than 9,000 times High-Performance Sync and Transfers simultaneously at the fastest speeds on your devices. Safety Guaranteed with high performance. The compact aluminum connector helps to keep your devices safe Compact heat-resistant Lightning connector fits into most case cutouts, big or small. The advanced technology used in our cables allows them to offer maximum charging speeds, making the product safe and reliable for users.


Product specifications

Brand iSOUL
EAN
  • 5055843407115
Material
  • Nylon
Color
  • Black
Size


Price History

* Price history contains no data from Amazon.

Prices were last updated on:

Featured Choice
£ 3.99
To Shop