JnDee Safe Voltage 300 Bright LEDs 30 Metres Multi Colours RGBY String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

Prices from
16.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Safe Low Voltage Design - Operates at just 31V DC output (NOT mains 240V), making these fairy lights completely safe around children and pets. The UK 3-pin plug with built-in transformer provides peace of mind for family homes. 30 Metres of Multi-Colour Brilliance - 300 vibrant RGB LEDs spaced 10cm apart on a discreet green wire, featuring red, green, blue, yellow and orange LEDs that create a stunning multicoloured glow for any occasion. 8 Lighting Modes with Memory - Choose from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, Combination and more. The built-in memory function remembers your last selected mode, so no need to reset each time. Convenient Timer & 10M Extension Lead - Set the 8 hours ON / 16 hours OFF timer and the lights will automatically repeat daily at the same time. The extra 10 metre extension lead from transformer to first light offers flexible placement without needing additional sockets. Indoor & Outdoor Use - IP44 waterproof rating withstands British weather for garden parties, patio decorating, Christmas displays and more. CE certified and UKCA marked for guaranteed quality and compliance.

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 16.99

£ 16.99

Description (1)

Safe Low Voltage Design - Operates at just 31V DC output (NOT mains 240V), making these fairy lights completely safe around children and pets. The UK 3-pin plug with built-in transformer provides peace of mind for family homes. 30 Metres of Multi-Colour Brilliance - 300 vibrant RGB LEDs spaced 10cm apart on a discreet green wire, featuring red, green, blue, yellow and orange LEDs that create a stunning multicoloured glow for any occasion. 8 Lighting Modes with Memory - Choose from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, Combination and more. The built-in memory function remembers your last selected mode, so no need to reset each time. Convenient Timer & 10M Extension Lead - Set the 8 hours ON / 16 hours OFF timer and the lights will automatically repeat daily at the same time. The extra 10 metre extension lead from transformer to first light offers flexible placement without needing additional sockets. Indoor & Outdoor Use - IP44 waterproof rating withstands British weather for garden parties, patio decorating, Christmas displays and more. CE certified and UKCA marked for guaranteed quality and compliance.


Product specifications

Brand JnDee
EAN
  • 0740016303749
Color
  • Multi colours(rgby)
MPN
  • SS-31vdc-100LED-L-MC-IP44

Featured Choice
£ 16.99
To Shop