Compare webshops (1)
Sponsored links · Some shops pay us a fee
Shops with other sizes
【Extension Cord with Multiple Outlets】: This power strip features 4 UK-standard 3-pin AC outlets, delivering 13A/3250W power to meet high electricity demands in densely populated settings such as homes, shopping malls, and college dorm doom 【Fast Charging】: Utilizing GaN technology, this socket extensions is equipped with 2 USB-A and 2 USB-C ports, delivering 30W total output for efficient simultaneous charging of multiple devices, significantly boosting charging efficiency 【Surge Protection】: This extension lead anti surge, can absorb voltage generated by 1500J lightning induction, etc., to avoid high voltage directly damaging the internal circuit of the equipment and extend the service life of the plug extension 【Switched Extension Lead】: Featuring a master switch, this extension board requires no complicated operation. It automatically cuts off power when the circuit or connected devices are overloaded, preventing damage caused by excessive current and power 【PC Fireproof Extension Socket】: Crafted from premium PC material with precision engineering, this extension socket prioritizes safety. It effectively flame retardant, ensuring compliant and worry-free electrical usage for all users 【Pure Copper Power Cord】: Featuring solid copper internal components and 1.25 mm² oxygen-free copper wiring, this extension cable ensures excellent conductivity, effectively reduces resistance loss, and enhances power transmission efficiency 【Space Saving】: Featuring a vertical design with outlets on 4 sides, this sleek black tower plug extension ensures stable plug insertion. Non-slip feet provide added security, perfectly blending aesthetic appeal with practical functionality 【5-metre Cable】: The extension wire comes with a durable 5 m power cord that is flexible yet resilient, resistant to wear, and easily extends to areas like balconies or outdoor gardens, meeting users' needs for long-distance power access 【Detailed Experience】: The power strip features a soft blue indicator light on the top, which illuminates when powered on, making it easy for users to locate the outlet in the dark. The light is evenly distributed and non-glaring