LONG Lead Acid Battery 12 V 2.9 Ah F1 (WP2.9 12TR) PBLO 12V002,9 F1A Black

Prices from
28.79

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon LONG 12 V 2.9 Ah Lead-acid battery F1 (WP2.9-12TR) LONG

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 28.79

Description (1)

LONG 12 V 2.9 Ah Lead-acid battery F1 (WP2.9-12TR) LONG


Product specifications

Brand Long
EAN
  • 8591849027461
Color
  • Black

Featured Choice
£ 28.79
To Shop