Compare webshops (1)
Sponsored links · Some shops pay us a fee
Sort by:
Shops with other sizes
Simultaneously Charge and play at the same time - cable allows continued game play Hi-Speed transfer rates up to 480Mbps. USB 2.0 A Male to Mini Male 5 Pin 5p Cable Color: Black. Length:10 feet / 3 meter. Compatible with: DualShock 3 controller, PlayStation 3/PS3 Slim, PS3 Move Motion Controller, PS3 Move Navigation Controller, PS3 Bluetooth Headset, PSP 1000/2000/3000