Warm devices feed or connection cable with safety plug, 1.5 M LEAD WIRE AND WARM Steckdose 175 ° High strong thanks to the cable cross-section of 1.0 mm² Suitable for most labor devices Maximum load 16 amp @ 220 Volt WS Colour: White
All merchants
- Vocalzone
- Spartoo
- BioGaia
- Gains Nutrition
- Earths Secrets
- Honor
- Björn Borg UK
- Pill Sphere
- 2bTanned
- Gallagher
- Liki 24
- Swoon London
- Sweatband
- Snowcountry
- TechInn
- VitaminExpress
- Hideaway Beds
- Radwell UK
- FixPart
- Office Machines
- Harts of Stur
- Philips Personal Health
- The Home Brew Shop
- Electricfence-online.co.uk
- Mizuno
- Whisky With Us
- Perfume Click
- Rachel Galley
- Currys
- Oceans Alive