Takt Planning: Lean Construction Scheduling With the Production System® & Last Planner® (The Art of Builder)

Prices from
46.60

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Takt Planning: Lean Construction Scheduling With the Production System® & Last Planner® (The Art of Builder)

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 46.60

Description (0)

Takt Planning: Lean Construction Scheduling With the Production System® & Last Planner® (The Art of Builder)


Product specifications

Brand Independently Published
EAN
  • 9798863734057

Featured Choice
£ 46.60
To Shop