The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library)

Prices from
12.84

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library)

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 12.84

Description (0)

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library)


Product specifications

Brand Independently Published
EAN
  • 9798161728192

Featured Choice
£ 12.84
To Shop