Trixie Nylon Long Lead 8m

Prices from
5.65

Sponsored links

COMPARE ALL WEBSHOPS (5)

Description

The Trixie Garden Dog Lead is designed for dogs that like to explore, offering weatherproof, shock-absorbing performance with a practical long reach for garden supervision. It features a suspension spring to help prevent injuries, and an easy-clean plastic coating that resists corrosion and helps keep the line from tangling. While it provides a safer, more secure option than standard chains or ropes, it is intended as a temporary measure and should not replace daily walking or be kept in permanent use.

Features

  • Weatherproof and shock-absorbing design
  • Long lead for extended outdoor exploration
  • Suspension spring to protect the dog
  • Plastic coating resists corrosion and aids cleaning
  • Keeps relatively stiff to prevent tangles or knots

Specifications

  • Length: 8 meters
  • Material: metal and plastic
  • Available color: red
  • Suitable for dogs of all sizes
  • Durable and reliable for garden use
  • Environmentally resilient coating for easy maintenance

Please note: a garden lead is only a temporary measure. This product does not replace the need for daily walking and should never be in permanent use.

Compare webshops (5)

Sponsored links · Some shops pay us a fee

Sort by:

£ 5.65

£ 5.65

£ 5.69

£ 8.99

£ 44.49

Description

The Trixie Garden Dog Lead is designed for dogs that like to explore, offering weatherproof, shock-absorbing performance with a practical long reach for garden supervision. It features a suspension spring to help prevent injuries, and an easy-clean plastic coating that resists corrosion and helps keep the line from tangling. While it provides a safer, more secure option than standard chains or ropes, it is intended as a temporary measure and should not replace daily walking or be kept in permanent use.

Features

  • Weatherproof and shock-absorbing design
  • Long lead for extended outdoor exploration
  • Suspension spring to protect the dog
  • Plastic coating resists corrosion and aids cleaning
  • Keeps relatively stiff to prevent tangles or knots

Specifications

  • Length: 8 meters
  • Material: metal and plastic
  • Available color: red
  • Suitable for dogs of all sizes
  • Durable and reliable for garden use
  • Environmentally resilient coating for easy maintenance

Please note: a garden lead is only a temporary measure. This product does not replace the need for daily walking and should never be in permanent use.


Product specifications

Brand Trixie
EAN
  • 4011905022925
Color
  • Red
Size
  • 8 m
Gender
  • Unisex
MPN
  • 2292
  • Trixie 2292


Price History

* Price history contains no data from Amazon, Amazon Marketplace.

Prices were last updated on:

Featured Choice
£ 5.65
To Shop