CONNECT & PRINT IN SECONDS – plug-and-play USB 2.0 printer cable links your printer or scanner to any PC, laptop or Mac with no drivers needed; high-speed 480 Mbps data transfer for fast, reliable printing and scanning WORKS WITH ALL MAJOR PRINTER BRANDS – printer cable for HP LaserJet, DeskJet, OfficeJet, Envy and Smart Tank, Epson Expression XP, WorkForce and EcoTank, Canon PIXMA and MAXIFY, Brother DCP, MFC and HL, plus Dell, Lexmark, Xerox and Samsung Xpress models MORE THAN A PRINTER LEAD – this USB A to USB B cable also connects external desktop hard drives and docks from WD, Seagate, Buffalo, LaCie, Toshiba, Freecom and Iomega, as well as scanners, audio interfaces, MIDI keyboards and other USB B devices BUILT TO LAST – durable USB B cable with corrosion-resistant connectors, foil-and-braid shielding to prevent interference, and a flexible strain-relief jacket tested for thousands of insertions; USB 2.0 backwards compatible with USB 1.1 ports THE RIGHT LENGTH FOR YOUR SETUP – this listing offers 0.5m, 1m, 2m, 3m and 5m lengths of the same quality USB A male to B male lead, so you can route the cable neatly from computer to printer whether they sit together or across the room
All merchants
- Pill Sphere
- Terry's Fabrics
- Roxy
- Buy Sheds Direct
- Honor
- Primrose
- Shredding machines
- Plusshop
- Judge Kitchenware
- Amazon
- Ecatering
- DiamondsByMe
- Cara & The Sky
- Gains Nutrition
- Escentual
- Known Nutrition
- SKINWORK
- DiveInn
- Scimx
- Welzo
- Roofing Superstore
- Euroffice
- SharkNinja
- Little Women Lingerie
- Electricshop
- Home Fitness Code
- YesStyle
- Jollein
- Lights.co
- Showery