Yosou iPhone Charger Cable 2m, Charging MFi Certified Lightning Nylon Braided Long Lead Fast For 11 12 13 14 Pro Max Mini XS XR X 10 8 7 Plus 6s 6 SE, iPad

Prices from
4.99

Featured

COMPARE ALL WEBSHOPS (2)

Description

Amazon 【iPhone MFi Certified Lightning Cable】: The newly upgraded original connector. Lightning Cable has passed MFi certification to ensure 100% compatibility with iPhone, iPad, iPod. 2m iphone charging cable enjoys fast data transfer, syncing and charging. 【2 m iPhone Cable Fast Charging】: The Yosou iPhone charger cable has an output power of up to 5V 3A, supporting high-speed, safe charging. It offers data transfer speeds of 40~60MB/s (480Mbps). This MFi-certified USB-A to Lightning cable ensures your devices charge safely and efficiently at maximum speed. 【Super Durable iPhone Charger Cable】: Premium nylon braided adds additional durability and tangle free with 40000+ bend lifespan. iPhone charger lead, built-in laser welding technology ensure the metal part won't break, tangle-free nylon braided design, makes iPhone charging cables 5 times stronger than other charging cables. 【Universal Compatibility】: Our iPhone charger cable is compatible with iphone 14 /14 Pro/ 14 Pro Max/14 Plus/13 /13 Pro/ 13 Pro Max/ 13 Mini/12 /12 Pro/ 12 Pro Max/ 12 Mini/ 11/ 11 Pro/ 11 Pro Max/ XR / XS / XS Max / X /10/ 8 / 8 Plus /7 / 7 Plus / 6s Plus / 6s / 6 Plus / 6/ 5s / 5c / 5 / SE / SE 2020, iPad Pro 10.5-inch / iPad Pro 12.9-inch / Pro 9.7-inch/Pro 2020/Pro 11/Air / Air 2 /mini/ mini 2 / mini 3 / mini 4 /mini 5/ ipad 7th / 6th / 8th gen. Compatible with all iOS8, iOS9, iOS10, iOS11, iOS12, iOS13, iOS14, iOS15, iOS16 new devices. 【2m iPhone Lead for Charging】: Yosou iphone charging lead with the 2m (6ft) length, you can lie on the sofa and use your devices while you are charging at the same time. Allow you to be use freely in bedroom, office and even in the backseat of your car. 【What you get】: You get nylon braided 1pack 2m iphone lightning cable (white) with 18-month service. If you have any questions about this Lightning to USB Cable Lead, please feel free to contact us! We will resolve your issue within 24 hours.

Compare webshops (2)

Shop
Price
£ 4.99
£ 4.99
Description (1)

【iPhone MFi Certified Lightning Cable】: The newly upgraded original connector. Lightning Cable has passed MFi certification to ensure 100% compatibility with iPhone, iPad, iPod. 2m iphone charging cable enjoys fast data transfer, syncing and charging. 【2 m iPhone Cable Fast Charging】: The Yosou iPhone charger cable has an output power of up to 5V 3A, supporting high-speed, safe charging. It offers data transfer speeds of 40~60MB/s (480Mbps). This MFi-certified USB-A to Lightning cable ensures your devices charge safely and efficiently at maximum speed. 【Super Durable iPhone Charger Cable】: Premium nylon braided adds additional durability and tangle free with 40000+ bend lifespan. iPhone charger lead, built-in laser welding technology ensure the metal part won't break, tangle-free nylon braided design, makes iPhone charging cables 5 times stronger than other charging cables. 【Universal Compatibility】: Our iPhone charger cable is compatible with iphone 14 /14 Pro/ 14 Pro Max/14 Plus/13 /13 Pro/ 13 Pro Max/ 13 Mini/12 /12 Pro/ 12 Pro Max/ 12 Mini/ 11/ 11 Pro/ 11 Pro Max/ XR / XS / XS Max / X /10/ 8 / 8 Plus /7 / 7 Plus / 6s Plus / 6s / 6 Plus / 6/ 5s / 5c / 5 / SE / SE 2020, iPad Pro 10.5-inch / iPad Pro 12.9-inch / Pro 9.7-inch/Pro 2020/Pro 11/Air / Air 2 /mini/ mini 2 / mini 3 / mini 4 /mini 5/ ipad 7th / 6th / 8th gen. Compatible with all iOS8, iOS9, iOS10, iOS11, iOS12, iOS13, iOS14, iOS15, iOS16 new devices. 【2m iPhone Lead for Charging】: Yosou iphone charging lead with the 2m (6ft) length, you can lie on the sofa and use your devices while you are charging at the same time. Allow you to be use freely in bedroom, office and even in the backseat of your car. 【What you get】: You get nylon braided 1pack 2m iphone lightning cable (white) with 18-month service. If you have any questions about this Lightning to USB Cable Lead, please feel free to contact us! We will resolve your issue within 24 hours.


Product specifications

Brand Yosou
EAN
  • 6972243896242
Color
  • White
MPN
  • YS-202103

Featured Choice
£ 4.99
To Shop