CERTIFIED HDMI 2.1 CABLE - Male-to-male HDMI lead offering 4K & 8K @60hz and 4K @120hz with a super fast transfer bandwidth of 48Gbps for 8K video and smooth, hi-def multi-channel digital audio transmission UNRIVALED CONNECTIVITY - Connects devices such as HDTVs, PCs, laptops, computers, projectors, DVD/Blu-ray players, streaming devices, soundbars, speakers, monitors, games consoles and many other devices with HDMI ports UNIVERSAL COMPATIBILITY - Fully compatible with PlayStation 5, PS4, PS3, Xbox One, Xbox 360, Nintendo Switch, Wii, NVIDIA RTX3070/3070Ti/3080/3080Ti/3090, AMD RX6800/6800XT/6900XT, Radeon RX 6000/GeForce RTX 3000, Apple TV, LG TV, Samsung QLED, Sony OLED, Fire TV, Roku TV & many, many more PROFESSIONAL QUALITY - Supports Extended Audio Return Channel (eARC), Variable Refresh Rate (VRR), Quick Frame Transport (QFT), Automatic Low Latency Mode (ALLM), Quick Media Switching (QMS), Display Stream Compression (DSC) & 3D gaming - fully backwards compatible 24K GOLD PLATED - High-quality materials for unbeatable performance - 24-karat gold plated connectors for long-term, corrosion-free stable signal transmission, aluminium alloy shell and a super-flexible 2-metre long kink-free nylon-threaded wire
Price History
* Price history contains no data from Amazon.
Prices were last updated on: