CELLONIC HDMI Cable 2.1 Ultra High Speed 4K 8K @60hz @120hz 48Gbps eARC VRR QFT ALLM QMS DSC Male to 24k Gold Plated 3m Long Lead Compatible for PS4, PS5, Xbox, Switch, Soundbar, TV

Prices from
7.03

Featured

COMPARE ALL WEBSHOPS (2)

Description

Amazon CERTIFIED HDMI 2.1 CABLE - Male-to-male HDMI lead offering 4K & 8K @60hz and 4K @120hz with a super fast transfer bandwidth of 48Gbps for 8K video and smooth, hi-def multi-channel digital audio transmission UNRIVALED CONNECTIVITY - Connects devices such as HDTVs, PCs, laptops, computers, projectors, DVD/Blu-ray players, streaming devices, soundbars, speakers, monitors, games consoles and many other devices with HDMI ports UNIVERSAL COMPATIBILITY - Fully compatible with PlayStation 5, PS4, PS3, Xbox One, Xbox 360, Nintendo Switch, Wii, NVIDIA RTX3070/3070Ti/3080/3080Ti/3090, AMD RX6800/6800XT/6900XT, Radeon RX 6000/GeForce RTX 3000, Apple TV, LG TV, Samsung QLED, Sony OLED, Fire TV, Roku TV & many, many more PROFESSIONAL QUALITY - Supports Extended Audio Return Channel (eARC), Variable Refresh Rate (VRR), Quick Frame Transport (QFT), Automatic Low Latency Mode (ALLM), Quick Media Switching (QMS), Display Stream Compression (DSC) & 3D gaming - fully backwards compatible 24K GOLD PLATED - High-quality materials for unbeatable performance - 24-karat gold plated connectors for long-term, corrosion-free stable signal transmission, aluminium alloy shell and a super-flexible 3-metre long kink-free nylon-threaded wire

Compare webshops (2)

Shop
Price
£ 7.03
£ 7.03
Description (1)

CERTIFIED HDMI 2.1 CABLE - Male-to-male HDMI lead offering 4K & 8K @60hz and 4K @120hz with a super fast transfer bandwidth of 48Gbps for 8K video and smooth, hi-def multi-channel digital audio transmission UNRIVALED CONNECTIVITY - Connects devices such as HDTVs, PCs, laptops, computers, projectors, DVD/Blu-ray players, streaming devices, soundbars, speakers, monitors, games consoles and many other devices with HDMI ports UNIVERSAL COMPATIBILITY - Fully compatible with PlayStation 5, PS4, PS3, Xbox One, Xbox 360, Nintendo Switch, Wii, NVIDIA RTX3070/3070Ti/3080/3080Ti/3090, AMD RX6800/6800XT/6900XT, Radeon RX 6000/GeForce RTX 3000, Apple TV, LG TV, Samsung QLED, Sony OLED, Fire TV, Roku TV & many, many more PROFESSIONAL QUALITY - Supports Extended Audio Return Channel (eARC), Variable Refresh Rate (VRR), Quick Frame Transport (QFT), Automatic Low Latency Mode (ALLM), Quick Media Switching (QMS), Display Stream Compression (DSC) & 3D gaming - fully backwards compatible 24K GOLD PLATED - High-quality materials for unbeatable performance - 24-karat gold plated connectors for long-term, corrosion-free stable signal transmission, aluminium alloy shell and a super-flexible 3-metre long kink-free nylon-threaded wire


Product specifications

Brand cellonic
EAN
  • 4063714189993
MPN
  • [{"value":942167}]

Featured Choice
£ 7.03
To Shop