DRUT 15m VGA Cable, 15 Pin HD15 Male to Male, all Pins, Black Long lead for monitors, projectors, TVs, PCs and KVM switches; pins wired; 50ft

Prices from
19.19

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon VGA Lead: HD15 plug on each end All Pins: All 15 pins connected Wide Use: Suits monitors, projectors and KVM switches Long Run: Picture may soften at full HD over long runs Cable Length: 15 m lead

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 19.19

Description (1)

VGA Lead: HD15 plug on each end All Pins: All 15 pins connected Wide Use: Suits monitors, projectors and KVM switches Long Run: Picture may soften at full HD over long runs Cable Length: 15 m lead


Product specifications

Brand DRUT
EAN
  • 5061007212389
Color
  • Black

Featured Choice
£ 19.19
To Shop