DRUT 20m VGA Cable, 15 Pin HD15 Male to Male, all Pins, Black Long lead for monitors, projectors, TVs, PCs and KVM switches; pins wired; 65ft

Prices from
27.19

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon VGA Lead: HD15 plug on each end All Pins: All 15 pins connected Wide Use: Suits monitors, projectors and KVM switches Long Run: Picture may soften at full HD over long runs Cable Length: 20 m lead

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 27.19

Description (1)

VGA Lead: HD15 plug on each end All Pins: All 15 pins connected Wide Use: Suits monitors, projectors and KVM switches Long Run: Picture may soften at full HD over long runs Cable Length: 20 m lead


Product specifications

Brand DRUT
EAN
  • 5061007212396
Color
  • Black

Featured Choice
£ 27.19
To Shop