Electrolytic Capacitor, 450V 22uf 105 Long Leads Axial Polarized Capacitors for Tube Amplifier, 20Pcs
Prices from
COMPARE ALL WEBSHOPS
(1)
Amazon
【High Performance】High quality electrolytic capacitors with stable performance 【User】Great choice for electronic professionals or enthusiasts 【Convenient to Use】The specifications of the capacitors is marked on its surface, convenient to use 【Heating Resistant】Heat resisting, low leakage, low loss and low impedance 【Application】Suitable for a wide range of electronic applications
Read more
7.90
![]() |
£ 7.90 | To Shop |
Description
Amazon
【High Performance】High quality electrolytic capacitors with stable performance 【User】Great choice for electronic professionals or enthusiasts 【Convenient to Use】The specifications of the capacitors is marked on its surface, convenient to use 【Heating Resistant】Heat resisting, low leakage, low loss and low impedance 【Application】Suitable for a wide range of electronic applications
Compare webshops (1)
Shop
Price
【High Performance】High quality electrolytic capacitors with stable performance 【User】Great choice for electronic professionals or enthusiasts 【Convenient to Use】The specifications of the capacitors is marked on its surface, convenient to use 【Heating Resistant】Heat resisting, low leakage, low loss and low impedance 【Application】Suitable for a wide range of electronic applications
Price History
Prices were last updated on: