5514 Holyhead is finished in accurate period detail as it appeared in the late 1930s Designed for reliable performance on OO gauge layouts, the locomotive is DCC ready with a 21-pin decoder socket and if fitted with Metal sprung buffers and NEM tension lock couplers History Henry Fowler designed the Patriot 4-6-0 for the LMS as an upgrade of the LNWR s Large Claughton Class for express passenger work Built at both Crewe and Derby Works, 42 and ten respectively, 52 entered service between 1930 and 1934 Holyhead was new from Crewe in September 1932, numbered 5983, but this was changed to 5514 in August 1938, as represented by the model
All merchants
- CalendarClub.co.uk
- Home Art Haven
- Pamelas Boutique
- Play Press Toys
- Primrose
- Fairybell
- Net Lighting
- Weighing-net
- The Green Spark Plug Company
- Milhaus
- Incontinence Online
- SKINWORK
- Little Women Lingerie
- D'Arienzo
- Bugaboo
- Wovenhill
- Ninja
- Electricshop
- Limepack
- Prestige
- Lindex
- Go Craft
- Power Tools Direct
- The White Smiles
- Mark Hill Hair
- Workout for Less
- EMDR Kit
- Shedstore
- Drainage Superstore
- Stretch it Body Jewellery