JnDee Safe Voltage 400 Bright LEDs 40 Metres Cool White String Fairy Lights for Christmas Tree Wedding, 8 Modes, Timer, Long Lead

Prices from
19.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon MASSIVE 400-LED COLD WHITE SPECTACLE — An extraordinary 400 LEDs spaced every 10cm across 40 metres of near-invisible green wire, creating an intense icy white glow with a cool blue edge. The ultimate choice for expansive gardens, event venues, commercial premises, and showpiece festive displays ULTRA-SAFE LOW VOLTAGE — PROTECTS CHILDREN AND PETS — Uses a safe 31V DC transformer with a UK 3-pin plug. These are low voltage fairy lights, NOT dangerous 240V mains — completely safe to use around kids, toddlers, and animals without any risk of electric shock 8 DAZZLING MODES WITH CONVENIENT MEMORY — Effortlessly cycle through Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes. The memory function saves your chosen mode automatically, so your lights are always set just how you want them AUTO TIMER AND 10M EXTENSION FOR HUGE COVERAGE — The 8 hours ON / 16 hours OFF daily timer runs itself once programmed. The included 10-metre extension cable from plug to first LED delivers an enormous 50 metres of total reach — perfect for the most ambitious lighting schemes IP44 WATERPROOF WITH FULL UK CERTIFICATION — Tough enough for year-round outdoor exposure with an IP44 weatherproof rating. CE certified and UKCA marked, meeting all required UK electrical safety standards for complete peace of mind

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 19.99

£ 19.99

Description (1)

MASSIVE 400-LED COLD WHITE SPECTACLE — An extraordinary 400 LEDs spaced every 10cm across 40 metres of near-invisible green wire, creating an intense icy white glow with a cool blue edge. The ultimate choice for expansive gardens, event venues, commercial premises, and showpiece festive displays ULTRA-SAFE LOW VOLTAGE — PROTECTS CHILDREN AND PETS — Uses a safe 31V DC transformer with a UK 3-pin plug. These are low voltage fairy lights, NOT dangerous 240V mains — completely safe to use around kids, toddlers, and animals without any risk of electric shock 8 DAZZLING MODES WITH CONVENIENT MEMORY — Effortlessly cycle through Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes. The memory function saves your chosen mode automatically, so your lights are always set just how you want them AUTO TIMER AND 10M EXTENSION FOR HUGE COVERAGE — The 8 hours ON / 16 hours OFF daily timer runs itself once programmed. The included 10-metre extension cable from plug to first LED delivers an enormous 50 metres of total reach — perfect for the most ambitious lighting schemes IP44 WATERPROOF WITH FULL UK CERTIFICATION — Tough enough for year-round outdoor exposure with an IP44 weatherproof rating. CE certified and UKCA marked, meeting all required UK electrical safety standards for complete peace of mind


Product specifications

Brand JnDee
EAN
  • 0740016303695
Color
  • Cool white
MPN
  • SS-31vdc-100LED-L-MC-IP44

Featured Choice
£ 19.99
To Shop