JnDee Safe Voltage 400 Bright LEDs 40 Metres Warm White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

Prices from
18.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Fairy Lights: 400 LED Warm White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire. Low Voltage Kids Pets Safe Design. Safe Indoor & Outdoor. RoHS and CE Certified. No risks of electric shocks. The IP44 rated Adapter is uniquely shaped and sockets with covers/flaps may not close fully when plugged in. Please check your outdoor socket if you plan to use it. 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination 8 Hour Timer: This function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exactly same time the following days.

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 18.99

£ 18.99

Description (1)

Fairy Lights: 400 LED Warm White Indoor & Outdoor Christmas Lights, Mains Powered Fairy Lights with 40m Light length & 10m Lead wire. Low Voltage Kids Pets Safe Design. Safe Indoor & Outdoor. RoHS and CE Certified. No risks of electric shocks. The IP44 rated Adapter is uniquely shaped and sockets with covers/flaps may not close fully when plugged in. Please check your outdoor socket if you plan to use it. 8 Mode with Memory Function: Static, Twinkle, Slow Fade, Chasing, Sequential, Wave & Combination 8 Hour Timer: This function provides a set-and-forget operation. When activated, the lights will be ON for 8 hours and OFF for 16 hours. It will be on automatically at the exactly same time the following days.


Product specifications

Brand JnDee
EAN
  • 0740016303688
Color
  • Warm white
MPN
  • SS-31vdc-100LED-L-MC-IP44

Featured Choice
£ 18.99
To Shop