LightsGo Waterproof Blue Icicle Christmas Fairy Lights 300 6 Metres Wide Plus Long Lead Cable Safe Voltage (300 6M)

Prices from
19.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Cascading icicle design - 60 vertical drops of varying lengths create a striking icy-blue waterfall effect along gutters, eaves and fences Discrete white cable - Blends naturally with white fascia and gutters for a seamless, professional appearance 10 metre lead included - No extension lead required; transformer to first light measures a generous 10M for flexible placement 8 lighting modes with memory - Steady On, In Waves, Sequential and more; built-in memory recalls your last selected mode Safe low voltage operation - 31V transformer with UK 3-pin plug; IP44 waterproof rating for reliable outdoor use

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 19.99

£ 19.99

Description (1)

Cascading icicle design - 60 vertical drops of varying lengths create a striking icy-blue waterfall effect along gutters, eaves and fences Discrete white cable - Blends naturally with white fascia and gutters for a seamless, professional appearance 10 metre lead included - No extension lead required; transformer to first light measures a generous 10M for flexible placement 8 lighting modes with memory - Steady On, In Waves, Sequential and more; built-in memory recalls your last selected mode Safe low voltage operation - 31V transformer with UK 3-pin plug; IP44 waterproof rating for reliable outdoor use


Product specifications

Brand LightsGo
EAN
  • 5060618120236
Color
  • Bule

Featured Choice
£ 19.99
To Shop