LightsGo Waterproof Blue Icicle Christmas Fairy Lights 400 10 Metres Wide Plus Long Lead Cable Safe Voltage (400 10M)

Prices from
24.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Cascading icicle design - 80 vertical drops of varying lengths create a striking icy-blue waterfall effect along gutters, eaves and fences Discrete white cable - Blends naturally with white fascia and gutters for a seamless, professional appearance 10 metre lead included - No extension lead required; transformer to first light measures a generous 10M for flexible placement 8 lighting modes with memory - Steady On, In Waves, Sequential and more; built-in memory recalls your last selected mode Safe low voltage operation - 31V transformer with UK 3-pin plug; IP44 waterproof rating for reliable outdoor use

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 24.99

£ 24.99

Description (1)

Cascading icicle design - 80 vertical drops of varying lengths create a striking icy-blue waterfall effect along gutters, eaves and fences Discrete white cable - Blends naturally with white fascia and gutters for a seamless, professional appearance 10 metre lead included - No extension lead required; transformer to first light measures a generous 10M for flexible placement 8 lighting modes with memory - Steady On, In Waves, Sequential and more; built-in memory recalls your last selected mode Safe low voltage operation - 31V transformer with UK 3-pin plug; IP44 waterproof rating for reliable outdoor use


Product specifications

Brand LightsGo
EAN
  • 5060618120243
Color
  • Blue

Featured Choice
£ 24.99
To Shop