Mr. Gadget's Solutions 2 Way/Gang 6M Long Lead Plug Extension Cable Socket White

Prices from
9.95

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Mr. Gadget's Solutions 2 Way/Gang 6M Long Lead Plug Extension Cable Socket White

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 9.95

£ 14.99

Description (0)

Mr. Gadget's Solutions 2 Way/Gang 6M Long Lead Plug Extension Cable Socket White


Product specifications

Brand Unbranded
EAN
  • 5055393617972
Material
  • Plastic
Color
  • White
Size


Price History

* Price history contains no data from Amazon.

Prices were last updated on:

Featured Choice
£ 9.95
To Shop