Mr. Gadget's Solutions 2 Way/Gang 6M Long Lead UK Plug Extension Cable Socket White

Prices from
14.99

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon 13 amp 2-way extension socket and lead will provide you with extra electric sockets for your indoor environment. The 6-metre cable offers you a convenient and practical solution to extend electricity in your rooms. The neon light indicator enables you to verify power is active to the extension socket

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

£ 14.99

Description (1)

13 amp 2-way extension socket and lead will provide you with extra electric sockets for your indoor environment. The 6-metre cable offers you a convenient and practical solution to extend electricity in your rooms. The neon light indicator enables you to verify power is active to the extension socket


Product specifications

Brand Mr. Gadget's Solutions
EAN
  • 5055393609502

Featured Choice
£ 14.99
To Shop