USB C Charger Cable Type Fast Charging Braided Long Lead for Samsung Galaxy S22 S21 S20 S10 S9 A12 A20e A21s A50 A70, Huawei P30,Sony Xperia, Xiaomi,Oppo,Google Pixel,Switch Gold (2M)

Prices from
3.69

Featured

COMPARE ALL WEBSHOPS (2)

Description

Amazon Well Compatibility: Used to connect your USB-C devices to any phone charger, computer or portable charger with standard USB ports. Compatible with all type c port devices Extra Durability: Triple-Braided Nylon fiber jacket and high quality aluminum alloy shell make the cable durable and sturdy. Nylon fiber provides strength, protection and flexibility. An additional layer of protection has been added to the Type C and USB ends to improve durability and reduce fraying Fast Chagrining: Premium tin-plated and antioxidant pure copper wires maximize signal quality, increase durability and guarantee fast charging and efficient syncing for all compatible devices. Charge and sync at the same time at the fastest speed on your device Convenience: Available in 3 ideal lengths like: 1M, 2M and 3M, which are ideal for using on your bed or sofa and some other places, making your life more convenient. Tangle-Free: Sturdy and tangle-free braided USB cable with can bear 4000+ bending test. These cables are more durable than other cables on the market. Eco-friendly braided material is no harmful to people, and your pets. Reversible Design: easily insert the Type-C connector into any Type-C enabled device (does not matter which side is up); up to 5 Gbps data transfer speed; power output up to 5V, 3 Amp

Compare webshops (2)

Sort by:

£ 3.69

£ 3.69

Description (1)

Well Compatibility: Used to connect your USB-C devices to any phone charger, computer or portable charger with standard USB ports. Compatible with all type c port devices Extra Durability: Triple-Braided Nylon fiber jacket and high quality aluminum alloy shell make the cable durable and sturdy. Nylon fiber provides strength, protection and flexibility. An additional layer of protection has been added to the Type C and USB ends to improve durability and reduce fraying Fast Chagrining: Premium tin-plated and antioxidant pure copper wires maximize signal quality, increase durability and guarantee fast charging and efficient syncing for all compatible devices. Charge and sync at the same time at the fastest speed on your device Convenience: Available in 3 ideal lengths like: 1M, 2M and 3M, which are ideal for using on your bed or sofa and some other places, making your life more convenient. Tangle-Free: Sturdy and tangle-free braided USB cable with can bear 4000+ bending test. These cables are more durable than other cables on the market. Eco-friendly braided material is no harmful to people, and your pets. Reversible Design: easily insert the Type-C connector into any Type-C enabled device (does not matter which side is up); up to 5 Gbps data transfer speed; power output up to 5V, 3 Amp


Product specifications

Brand MAXIMUM RANGE E-SELLERS
EAN
  • 5060952290749
Color
  • Gold
MPN
  • Brd-c-Gold

Featured Choice
£ 3.69
To Shop