USB C to Lightning Cable 2M [Apple MFi Certified], iPhone Fast Charger Nylon Charging Long Lead Wire for 14 Pro Max/13/12/11/XS/8,iPad
![]() |
£ 4.99 | To Shop |
Description
Amazon
【Widely Compatibility iPhone Charger Cable USB C】The USB C to lightning cables support PD power delivery fast charging for iPhone 14 Pro/14 Pro Max/14/14 Plus/13/13 Pro/13 Pro Max/13 Mini/12/12 Mini/12 Pro/12 Pro Max/SE 2020/11/11 Pro/11 Pro Max/XR/XS Max/ XS/X/ 8/8 Plus,iPad and other later models when using your USB-C PD charger (Note:You need a 20W or above USB-C Power Adapter to match it.). And the USB C iphone charger cables also support the standard charge (5V/2.4A max) for iPhone 7 Plus/7/6 Plus/6/6S Plus/6S/5S/5C. 【3A PD Fast Charging&Data Transfer iPhone Fast Charger Cable】The 2M long USB C iPhone charger cable support fast charging when you using USB-C PD power delivery Chargers, the USB C apple iphone charger cable can charge your iPhone 14 13 12 from 0 to 50% in 30 minutes, which is much faster than the standard Apple iPhone charging cable(5V/1V). Besides, the iPhone 13 charger cable also suppot date transmission up to 480Mbps, works as great as the original Apple iPhone charger cable. 【Apple Mfi-Certified USB C Lightning Cable】Our iPhone fast charger cable have completed MFi certification requirements,Which can be found on the official site of Mfi-Certified.The fast charging iphone charger cable use the newest lightning end design for fast charging, which can safely and quickly charge your iPhone/iPad/iPod device.Enjoy fast data transfer, syncing and charging. 【Flexible and Durable iPhone Lightning Cables】The 2M long iPhone cable USB C is made of top-rated material and coated with premium TPE, which last 4X longer than other iphone charger cable cord and proven to withstand over 80,000 bends in strict laboratory tests.The USB C iPhone cable fast charging durability is three times as long as that of ordinary iPhone charging cables. 【Perfect One Pack 2M Long iPhone Charger Cable USB C】With the 2M fast charging USB C lightning cable, you can lie in the couch or sofa to fast charge your iPhone devices without moving. Providing a much more comfortable for reading e-books, playing games, watching videos.In order to achieve lightning-like charging speeds, please connect the cable to an appropriate USB-C Power Delivery power supply device. 【What your get】You will receive 1pack 2m Nylon iPhone lightning cable USB C with 24 Months Worry-Free Replacement and 24/7 customer service, if you have any questions about the Apple charger cable, we will help you solve the issues.
Compare webshops (1)
【Widely Compatibility iPhone Charger Cable USB C】The USB C to lightning cables support PD power delivery fast charging for iPhone 14 Pro/14 Pro Max/14/14 Plus/13/13 Pro/13 Pro Max/13 Mini/12/12 Mini/12 Pro/12 Pro Max/SE 2020/11/11 Pro/11 Pro Max/XR/XS Max/ XS/X/ 8/8 Plus,iPad and other later models when using your USB-C PD charger (Note:You need a 20W or above USB-C Power Adapter to match it.). And the USB C iphone charger cables also support the standard charge (5V/2.4A max) for iPhone 7 Plus/7/6 Plus/6/6S Plus/6S/5S/5C. 【3A PD Fast Charging&Data Transfer iPhone Fast Charger Cable】The 2M long USB C iPhone charger cable support fast charging when you using USB-C PD power delivery Chargers, the USB C apple iphone charger cable can charge your iPhone 14 13 12 from 0 to 50% in 30 minutes, which is much faster than the standard Apple iPhone charging cable(5V/1V). Besides, the iPhone 13 charger cable also suppot date transmission up to 480Mbps, works as great as the original Apple iPhone charger cable. 【Apple Mfi-Certified USB C Lightning Cable】Our iPhone fast charger cable have completed MFi certification requirements,Which can be found on the official site of Mfi-Certified.The fast charging iphone charger cable use the newest lightning end design for fast charging, which can safely and quickly charge your iPhone/iPad/iPod device.Enjoy fast data transfer, syncing and charging. 【Flexible and Durable iPhone Lightning Cables】The 2M long iPhone cable USB C is made of top-rated material and coated with premium TPE, which last 4X longer than other iphone charger cable cord and proven to withstand over 80,000 bends in strict laboratory tests.The USB C iPhone cable fast charging durability is three times as long as that of ordinary iPhone charging cables. 【Perfect One Pack 2M Long iPhone Charger Cable USB C】With the 2M fast charging USB C lightning cable, you can lie in the couch or sofa to fast charge your iPhone devices without moving. Providing a much more comfortable for reading e-books, playing games, watching videos.In order to achieve lightning-like charging speeds, please connect the cable to an appropriate USB-C Power Delivery power supply device. 【What your get】You will receive 1pack 2m Nylon iPhone lightning cable USB C with 24 Months Worry-Free Replacement and 24/7 customer service, if you have any questions about the Apple charger cable, we will help you solve the issues.
Price History
Prices were last updated on: