JnDee Safe Voltage 500 Bright LEDs 50 Metres Blue String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

Prices from
22.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Safe Low Voltage Design - Operates at just 31V DC output (not dangerous 240V mains), making these blue fairy lights completely safe around children and pets. The CE certified and UKCA marked transformer with UK 3-pin plug ensures complete peace of mind for family homes. 8 Lighting Modes with Memory Function - Choose from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes. The built-in memory function remembers your last selected setting, so you never have to reset your preferred mode after switching off. Built-in Timer for Hassle-Free Operation - Set the timer once and the lights automatically turn on for 8 hours and off for 16 hours, repeating daily at the same time. Perfect for Christmas trees, garden features, and bedroom decoration without the need to manually switch them on and off. Extra-Long 10 Metre Extension Lead - Unlike standard fairy lights, these come with a generous 10M cable from the transformer to the first LED, giving you incredible flexibility to reach plug sockets without unsightly extension cords. The green wire blends discreetly into foliage, trees, and garlands. IP44 Waterproof for Indoor & Outdoor Use - These vivid deep blue LED string lights are rated IP44 for reliable outdoor performance in British weather. Ideal for garden parties, patio decoration, Christmas trees, wedding venues, bedroom ambience, and year-round outdoor features.

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 22.99

£ 22.99

Description (1)

Safe Low Voltage Design - Operates at just 31V DC output (not dangerous 240V mains), making these blue fairy lights completely safe around children and pets. The CE certified and UKCA marked transformer with UK 3-pin plug ensures complete peace of mind for family homes. 8 Lighting Modes with Memory Function - Choose from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes. The built-in memory function remembers your last selected setting, so you never have to reset your preferred mode after switching off. Built-in Timer for Hassle-Free Operation - Set the timer once and the lights automatically turn on for 8 hours and off for 16 hours, repeating daily at the same time. Perfect for Christmas trees, garden features, and bedroom decoration without the need to manually switch them on and off. Extra-Long 10 Metre Extension Lead - Unlike standard fairy lights, these come with a generous 10M cable from the transformer to the first LED, giving you incredible flexibility to reach plug sockets without unsightly extension cords. The green wire blends discreetly into foliage, trees, and garlands. IP44 Waterproof for Indoor & Outdoor Use - These vivid deep blue LED string lights are rated IP44 for reliable outdoor performance in British weather. Ideal for garden parties, patio decoration, Christmas trees, wedding venues, bedroom ambience, and year-round outdoor features.


Product specifications

Brand JnDee
EAN
  • 0740016303794
Color
  • Blue
MPN
  • SS-31vdc-100LED-L-MC-IP44

Featured Choice
£ 22.99
To Shop