JnDee Safe Voltage 500 Bright LEDs 50Metres Cool White String Fairy Lights for Christmas Tree Party Wedding Events, 8 Modes, Timer, Long Lead

Prices from
21.99

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon EXTRAORDINARY 500-LED COLD WHITE DISPLAY — A breathtaking 500 LEDs spaced at 10cm intervals across 50 metres of green wire, producing a powerful icy white glow with a stunning blue-tinted brilliance. The definitive lighting solution for grand gardens, large venues, street displays, and ambitious decorative projects COMPLETELY SAFE LOW VOLTAGE — NO DANGEROUS 240V — Operates at a safe 31V DC output via the included UK 3-pin plug transformer. These low voltage lights are entirely safe for children, toddlers, pets, and animals — no risk of electric shock anywhere in your home or garden 8 LIGHTING MODES WITH MEMORY AND AUTO TIMER — Select from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes, all with memory recall. The 8 hours ON / 16 hours OFF timer repeats daily at the same time, giving you complete hands-free lighting control INCREDIBLE 60 METRE TOTAL REACH WITH 10M EXTENSION — Includes a 10-metre extension cable from plug to first LED, combining with the 50 metres of lit wire for an unmatched . Reach the furthest corners of any property without additional extension leads IP44 WATERPROOF, CE CERTIFIED AND UKCA MARKED — Professionally rated for all-weather indoor and outdoor use with an IP44 waterproof construction. Fully CE certified and UKCA marked to the highest UK electrical safety standards for dependable, year-round operation

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

£ 21.99

£ 21.99

Description (1)

EXTRAORDINARY 500-LED COLD WHITE DISPLAY — A breathtaking 500 LEDs spaced at 10cm intervals across 50 metres of green wire, producing a powerful icy white glow with a stunning blue-tinted brilliance. The definitive lighting solution for grand gardens, large venues, street displays, and ambitious decorative projects COMPLETELY SAFE LOW VOLTAGE — NO DANGEROUS 240V — Operates at a safe 31V DC output via the included UK 3-pin plug transformer. These low voltage lights are entirely safe for children, toddlers, pets, and animals — no risk of electric shock anywhere in your home or garden 8 LIGHTING MODES WITH MEMORY AND AUTO TIMER — Select from Steady On, Twinkle/Flash, Slow Fade, Chasing, Sequential, Wave, and Combination modes, all with memory recall. The 8 hours ON / 16 hours OFF timer repeats daily at the same time, giving you complete hands-free lighting control INCREDIBLE 60 METRE TOTAL REACH WITH 10M EXTENSION — Includes a 10-metre extension cable from plug to first LED, combining with the 50 metres of lit wire for an unmatched . Reach the furthest corners of any property without additional extension leads IP44 WATERPROOF, CE CERTIFIED AND UKCA MARKED — Professionally rated for all-weather indoor and outdoor use with an IP44 waterproof construction. Fully CE certified and UKCA marked to the highest UK electrical safety standards for dependable, year-round operation


Product specifications

Brand JnDee
EAN
  • 0740016303817
Color
  • Cool white
MPN
  • SS-31vdc-100LED-L-MC-IP44

Featured Choice
£ 21.99
To Shop