10m 4K HDMI Cable: Long-reach lead for TVs, monitors and projectors—ideal for home cinema, classrooms and meeting rooms. Supports HDR and HDCP 2.2/1.4, and is backwards-compatible with earlier HDMI versions. HDMI 2.0 / 18Gbps Bandwidth: Supports up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). Works with HDR10, Dolby Vision, ARC, Dolby Atmos and DTS-HD (when supported) for enhanced picture detail and multi-channel audio. Reliable Long-Distance Build: Reinforced gold-plated connectors with an aluminium alloy shell, 28AWG high-purity copper conductors and a flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal over long runs, including 10m installations. Wide Compatibility: Connects to HDMI-enabled 4K & Full HD TVs, monitors and projectors, as well as PCs/laptops, AV receivers and soundbars. Ideal for Sky/Virgin boxes, streaming devices and gaming consoles like PS5 and Xbox Series X. UK Brand, Multiple Lengths: Designed by a UK brand focused on dependable build quality and responsive customer support. Choose the right length (2m–30m) for home cinema, gaming, offices and professional AV installs.
Price History
* Price history contains no data from Amazon, Amazon Marketplace.
Prices were last updated on: