True HQ 4K HDMI Cable 15m, High Speed 18Gbps (HDMI 2.0), 4K@60Hz Ultra HD with HDR10, ARC, HDCP 2.2 and Ethernet Long Lead for TV, Projector, Monitor, PS5, Xbox

Prices from
14.99

Sponsored links

COMPARE ALL WEBSHOPS (3)

Description

Amazon 15m 4K HDMI Cable (Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for wall TVs, offices and home-cinema setups where equipment is further apart. HDCP 2.2/1.4, HDR support, backwards compatible. HDMI 2.0 / 18Gbps: Up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). On 15m runs, results can vary by device/HDMI port - try another port, enable 4:2:0 if available, or reduce output to 4K@30/1080p. Reliable Build Quality: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a stable picture over longer runs. Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported). UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, office display setups and professional AV installs.

Compare webshops (3)

Sponsored links · Some shops pay us a fee

Sort by:

£ 14.99

£ 14.99

£ 22.81

Description (1)

15m 4K HDMI Cable (Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for wall TVs, offices and home-cinema setups where equipment is further apart. HDCP 2.2/1.4, HDR support, backwards compatible. HDMI 2.0 / 18Gbps: Up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). On 15m runs, results can vary by device/HDMI port - try another port, enable 4:2:0 if available, or reduce output to 4K@30/1080p. Reliable Build Quality: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a stable picture over longer runs. Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported). UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, office display setups and professional AV installs.


Product specifications

Brand True HQ
EAN
  • 5060706610120
Color
  • Black
Size
  • 15m
  • 15 m
MPN
  • TRUEHQ-HDMI-15M


Price History

* Price history contains no data from Amazon, Amazon Marketplace.

Prices were last updated on:

Featured Choice
£ 14.99
To Shop