20m 4K HDMI Cable (Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for ceiling-mounted projectors, wall TVs, offices & home cinema installs. HDCP 2.2/1.4, backwards compatible. HDMI 2.0 / 18Gbps: Up to 4K@60Hz, 1440p@144Hz, 1080p@240Hz (device/settings dependent). On 20m runs, some lower-powered HDMI ports may only manage 4K@30—try another port, reduce output settings, or add a powered HDMI booster. Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a stable picture on long runs. Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported). UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m–30m) for home cinema, gaming, office display setups and professional AV installs.
Price History
* Price history contains no data from Amazon.
Prices were last updated on: