25m 4K HDMI Cable (Extra-Long Runs): High-speed lead for 4K UHD TVs, monitors & projectors. Ideal for long home-cinema routes, offices, meeting rooms and projector installs. HDCP 2.2/1.4, HDR support, backwards compatible. HDMI 2.0 / 18Gbps: Up to 4K@60Hz (device/settings dependent). On 25m runs, many setups are more stable at 4K@30 or 1080p - try another HDMI port, lower output settings, or add a powered HDMI booster/repeater for long distances. Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for a consistent signal over long runs. Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported). UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, offices, meeting rooms and professional AV installs.
All merchants
- The Personal Barber
- Pets Villa
- Known Nutrition
- Evelyn Gold
- Drainage Superstore
- Xiaomi
- RattanTree
- Supplement Hub
- Limepack
- National Shower Spares
- Power Tools Direct
- Plusshop
- Mustard.Shop
- Lights.co
- The Home Brew Shop
- Stattics
- Liki 24
- Robell
- Safetrade247
- Net Lighting
- Plumbing Superstore
- Kitchen Knives
- Kettler Outdoor Furniture
- GreatBeanBags.com
- Showery
- Darts Corner
- Dotty Fish
- Sheet Story
- Cheeky Rascals
- Honor