30m HDMI Cable (Ultra-Long Runs): Built for very long routes to TVs, projectors and AV equipment. Ideal for home cinema, offices and installations where devices are far apart. HDCP 2.2/1.4 and HDR support, backwards compatible. HDMI 2.0 (Ultra-Long Run Setup): Performance is device dependent; at 30m many setups are more stable at 1080p. For 4K or higher refresh rates, a powered HDMI booster/repeater is typically required (or reduce output settings). Reliable Long-Distance Build: Reinforced gold-plated connectors with aluminium alloy shell, 28AWG high-purity copper and flexible soft-matte PVC jacket. Triple-layer shielding helps reduce interference for the best possible long-run signal. Wide Compatibility + Features: Works with HDMI TVs/monitors/projectors, PCs, AV receivers & soundbars, Sky/Virgin, streaming devices and PS5/Xbox. Supports HDR10/Dolby Vision, ARC, Dolby Atmos & DTS-HD (when supported). UK Brand, Dedicated Support: Designed by a UK brand focused on dependable build quality and responsive help. Choose the right length (2m-30m) for home cinema, gaming, offices and professional AV installations.
All merchants
- The Personal Barber
- Pets Villa
- Known Nutrition
- Evelyn Gold
- Drainage Superstore
- Xiaomi
- RattanTree
- Supplement Hub
- Limepack
- National Shower Spares
- Power Tools Direct
- Plusshop
- Mustard.Shop
- Lights.co
- The Home Brew Shop
- Stattics
- Liki 24
- Robell
- Safetrade247
- Net Lighting
- Plumbing Superstore
- Kitchen Knives
- Kettler Outdoor Furniture
- GreatBeanBags.com
- Showery
- Darts Corner
- Dotty Fish
- Sheet Story
- Cheeky Rascals
- Honor